Testing begins on LA Gold Line extension
本文摘要:THE first light rail vehicle ran on the Los Angeles Gold Line Foothill extension on December 9, kicking off the testing phase on the 17 7km link between Pasadena and Azusa
    THE first light rail vehicle ran on the Los Angeles Gold Line Foothill extension on December 9, kicking off the testing phase on the 17.7km link between Pasadena and Azusa.
 
    The AnsaldoBreda P2250 LRV was hauled by a road-rail vehicle over an 8km stretch of the line between East Pasadena and Monrovia to check clearances. Gauging runs will continue over the next two weeks, with tests focussing on catenary, switches and crossings, and the wheel/rail interface. During this phase the LRV will operate under its own power where the electrification has been energised.
 
    Testing will continue until September 2015, when the six-station extension will be handed over to Los Angeles County Metropolitan Transportation Authority (LACMTA) for commissioning.
 
    A further five-station extension from Azusa to Montclair is planned.
LA
 
Gold
 
Line,
 
extension
 
扫码关注“光伏产业观察网”微信公众号
《光伏产业观察》创办于2010年,由中国循环经济协会可再生能源专业委员会、中国可再生能源学会光伏专业委员会、中国光伏行业协会共同主办,深受光伏行业认可,是业内知名媒体。