Andora - San Lorenzo line inaugurated
本文摘要:AN inauguration ceremony for the Andora - San Lorenzo section of the Genova - Savona - Ventimiglia line was held on December 11 with Italy’s vice-minister of infrastructure and transport Mr Riccardo Nencini, Liguria’s governor Mr Giovanni Toti, and regional deputy for occupation, transport, tourism and human resources, Mr Giovanni Berrino, participating in the inaugural journey on the line
AN inauguration ceremony for the Andora - San Lorenzo section of the Genova - Savona - Ventimiglia line was held on December 11 with Italy’s vice-minister of infrastructure and transport Mr Riccardo Nencini, Liguria’s governor Mr Giovanni Toti, and regional deputy for occupation, transport, tourism and human resources, Mr Giovanni Berrino, participating in the inaugural journey on the line.

Italian Rail Network (RFI) president Ms Caludia Cattani was also present along with RFI CEO Mr Maurizio Gentile, Trenitalia’s CEO Ms Barbara Morgante, and Italferr’s CEO Mr Carlo Carganico.

The new double-track line follows on from the 19km extension from San Lorenzo to Ospedaletti which includes 16km of tunnels, and which opened in 2001.

New stations have been built at Andora, Diano and Imperia replacing the two city stations Imperia Oneglia and Imperia Porto Maurizio.

The control room for the section is located at Genova Teglia and will permit speeds of up to 180km/h on the line. The new line will offer 10 journeys between Savona and Ventimiglia, meaning 62 trains will call at Imperia.

The total investment for the project is €582m.

Andora
 
-
 
San
 
Lorenzo
 
line
 
 
扫码关注“光伏产业观察网”微信公众号
《光伏产业观察》创办于2010年,由中国循环经济协会可再生能源专业委员会、中国可再生能源学会光伏专业委员会、中国光伏行业协会共同主办,深受光伏行业认可,是业内知名媒体。