Central of Metro Line 14 to open by late 2015
本文摘要:The middle part of Beijing Metro Line 14 will open by the end of the year The 16 km railway will be finishe
The middle part of Beijing Metro Line 14 will open by the end of the year. The 16 km railway will be finished in late June and stops along the line have been finished.
 
A five km section in the Lize business district won't be put into use until 2019.
 
Starting from Shangezhuang in northeastern Beijing, the L-shaped Line 14 runs southward to Beijing University of Technology, then westward to Shilihe and finally reaches Zhangguozhuang in Fengtai district.
 
The line is divided into three parts. The western part that comprises of seven stops opened in May 2013 and the eastern part that runs through 12 stops put into use in late 2014.
 
 
 
Central
 
of
 
Metro
 
Line
 
14
 
to
 
open
 
by
 
late
 
2015
 
扫码关注“光伏产业观察网”微信公众号
《光伏产业观察》创办于2010年,由中国循环经济协会可再生能源专业委员会、中国可再生能源学会光伏专业委员会、中国光伏行业协会共同主办,深受光伏行业认可,是业内知名媒体。