CNR delivers locomotives to DR Congo
本文摘要:CNR Type CKD8C1 diesel-electric locomotives for SNCC The locomotive contract was signed in Kinshasa on December 5
CNR Type CKD8C1 diesel-electric locomotives for SNCC.The locomotive contract was signed in Kinshasa on December 5 2013.
DR CONGO: A batch of 18 CNR Beijing February 7 Railway Transport Equipment Co Type CKD8C1 diesel-electric locomotives ordered by national railway company SNCC was shipped from the Chinese port of Tianjin on April 8.
 
The new locomotives were procured as part of the Multimodal Transport Project, which was launched in in 2010 with the aim of restoring the financial and operational viability of the 1 067 mm gauge network. The World Bank is providing US$375m in grant funding for the programme.
 
The locomotive contract was signed in Kinshasa on December 5 2013 by representatives from CNR, Bank of Congo and China Shandong Economic & Technical Co-operation Group. CNR February 7 said it was the second-largest locomotive export contract it had won, after a contract to supply 112 locomotives to Cuba.
 
A feature article on the revival of SNCC appeared in the July 2014 issue of Railway Gazette International, which subscribers can access in the digital archive.
扫码关注“光伏产业观察网”微信公众号
《光伏产业观察》创办于2010年,由中国循环经济协会可再生能源专业委员会、中国可再生能源学会光伏专业委员会、中国光伏行业协会共同主办,深受光伏行业认可,是业内知名媒体。